arXiv · 0908.0390
Byzantine Convergence in Robots Networks: The Price of Asynchrony
Abstract
We study the convergence problem in fully asynchronous, uni-dimensional robot networks that are prone to Byzantine (i.e. malicious) failures. In these settings, oblivious anonymous robots with arbitrary initial positions are required to eventually converge to an a apriori unknown position despite a subset of them exhibiting Byzantine behavior. Our contribution is twofold. We propose a deterministic algorithm that solves the problem in the most generic settings: fully asynchronous robots that operate in the non-atomic CORDA model. Our algorithm provides convergence in 5f+1-sized networks where f is the upper bound on the number of Byzantine robots. Additionally, we prove that 5f+1 is a lower bound whenever robot scheduling is fully asynchronous. This constrasts with previous results in partially synchronous robots networks, where 3f+1 robots are necessary and sufficient.
Explore related subjects
Keep this discovery
Zohir Bouzid, Maria Potop-Butucaru, Sébastien Tixeuil. 2009-08-04. Byzantine Convergence in Robots Networks: The Price of Asynchrony. https://arxiv.org/abs/0908.0390
Cite the original work for its findings. Save a collection to share your selection of sources.