Search arXivSearch

arXiv · 1301.6673

Analysis of the first IPTA Mock Data Challenge by the EPTA timing data analysis working group

Abstract

This is a summary of the methods we used to analyse the first IPTA Mock Data Challenge (MDC), and the obtained results. We have used a Bayesian analysis in the time domain, accelerated using the recently developed ABC-method which consists of a form of lossy linear data compression. The TOAs were first processed with Tempo2, where the design matrix was extracted for use in a subsequent Bayesian analysis. We used different noise models to analyse the datasets: no red noise, red noise the same for all pulsars, and individual red noise per pulsar. We sampled from the likelihood with four different samplers: "emcee", "t-walk", "Metropolis-Hastings", and "pyMultiNest". All but emcee agreed on the final result, with emcee failing due to artefacts of the high-dimensionality of the problem. An interesting issue we ran into was that the prior of all the 36 (red) noise amplitudes strongly affects the results. A flat prior in the noise amplitude biases the inferred GWB amplitude, whereas a flat prior in log-amplitude seems to work well. This issue is only apparent when using a noise model with individually modelled red noise for all pulsars. Our results for the blind challenges are in good agreement with the injected values. For the GWB amplitudes we found h_c = 1.03 +/- 0.11 [10^{-14}], h_c = 5.70 +/- 0.35 [10^{-14}], and h_c = 6.91 +/- 1.72 [10^{-15}], and for the GWB spectral index we found gamma = 4.28 +/- 0.20, gamma = 4.35 +/- 0.09, and gamma = 3.75 +/- 0.40. We note that for closed challenge 3 there was quite some covariance between the signal and the red noise: if we constrain the GWB spectral index to the usual choice of gamma = 13/3, we obtain the estimates: h_c = 10.0 +/- 0.64 [10^{-15}], h_c = 56.3 +/- 2.42 [10^{-15}], and h_c = 4.83 +/- 0.50 [10^{-15}], with one-sided 2 sigma upper-limits of: h_c <= 10.98 [10^{-15}], h_c <= 60.29 [10^{-15}], and h_c <= 5.65 [10^{-15}].

Explore related subjects

Keep this discovery

BibTeXRIS

Rutger van Haasteren, Chiara M. F. Mingarelli, Alberto Vecchio, Antoine Lassus. 2013-01-28. Analysis of the first IPTA Mock Data Challenge by the EPTA timing data analysis working group. https://arxiv.org/abs/1301.6673

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related papers

The EDD Radio Astronomy Backend Framework

Modern digital radio astronomy receivers produce increasingly wide-bandwidth, high bit-rate data streams that necessitate the development of flexible, scalable, and maintainable backend processing and recording systems. Historically, such backend instrumentation has been tightly coupled to telescope observing modes, limiting reuse between observatories and science cases. We present the Effelsberg Direct Digitisation (EDD) backend framework, a software-defined architecture for constructing real-time radio astronomy backends on commodity off-the-shelf computing infrastructure. We describe its design, implementation, supported observing modes, and operational deployments. EDD separates a common core framework from plugin-provided observing capabilities. The core provides orchestration, telescope interfaces, pipeline lifecycle management, monitoring, and deployment tooling, while plugins implement processing pipelines for specific observing modes. The framework is designed to support both single-dish and interferometric instruments through site-specific configuration and plugin selection. EDD currently supports spectroscopy and spectropolarimetry, pulsar timing and searching, baseband recording, very long baseline interferometry, correlation, and beamforming. Operational deployments include the Effelsberg 100-m telescope, the SKA-MPI prototype dish, the Thai National Radio Telescope, and the ARGOS interferometric prototype array. By separating common services, observing-mode plugins, and site-specific configuration, it allows backend capabilities to be deployed across heterogeneous telescope environments and provides a community resource for broadband radio astronomy instrumentation.

astro-ph.IM

Bayesian Superiority in On/Off analysis

We present a detailed comparison of Bayesian criteria with three non-informative priors - flat, Jeffreys, and scale-invariant - for testing a signal against an unknown background and compare them with the classical frequentist Li-Ma approach in the On/Off problem. We perform Monte Carlo simulations for various background levels and evaluate the Li-Ma and Bayesian criteria by their Type I error rates. We then simulate a nonzero signal and compare the criteria in terms of Type II error rates. We find that the Bayesian criterion with the Jeffreys prior yields lower Type I and Type II error rates than the Li-Ma criterion. In addition, we show that the Bayesian criteria are more robust than the Li-Ma criterion when the background distribution is overdispersed relative to the Poisson distribution.

astro-ph.IM

An RFSoC-based Backend and Timing System for the Balloon-borne Very Long Baseline Interferometry Experiment

We present the design and performance characterization of the digital backend and precision-timing system for the Balloon-borne Very Long Baseline Interferometry Experiment (BVEX), a pathfinder for high-frequency stratospheric VLBI at 22 GHz. The backend uses one of the four 14-bit analog-to-digital converter inputs on an AMD-Xilinx RFSoC 4x2. Although the converters support sampling rates up to 5 GSPS, the flight configuration digitizes the 2-4 GHz intermediate frequency at 4.096 GSPS. CASPER firmware provides both a high-resolution spectrometer for pointing and receiver verification, and a VLBI acquisition chain with two-bit requantization that records at a rate of about 8.2 Gbps. The timestamped data packets are sent over 100 Gigabit Ethernet (GbE) to a 16 TB NVMe array in a storage computer that draws approximately 70-80 W. The timing chain uses a Rakon oven-controlled crystal oscillator as a timing reference while a time-interval counter measures its drift relative to a GPS reference with approximately 60 ps resolution. This is the first deployment of an RFSoC-based VLBI backend and precision-timing system on a stratospheric balloon. Ground tests validated the backend, spectrometer, and timing chain. The August 2025 CSA STRATOS flight ended before reaching the target float altitude because of a balloon failure, and as a result no science observations were obtained. For the planned 2027 reflight, we are developing a conduction-cooled data storage computer with 24 TB of NVMe capacity and a direct data path from the 100 GbE interface to the NVMe array.

astro-ph.IM