Search arXivSearch

arXiv · 1905.03213

Parallel implementation of w-projection wide-field imaging

Abstract

w-Projection is a wide-field imaging technique that is widely used in radio synthesis arrays. Processing the wide-field big data generated by the future Square Kilometre Array (SKA) will require significant updates to current methods to significantly reduce the time consumed on data processing. Data loading and gridding are found to be two major time-consuming tasks in w-projection. In this paper, we investigate two parallel methods of accelerating w-projection processing on multiple nodes: the hybrid Message Passing Interface (MPI) and Open Multi-Processing (OpenMP) method based on multicore Central Processing Units (CPUs) and the hybrid MPI and Compute Unified Device Architecture (CUDA) method based on Graphics Processing Units (GPUs). Both methods are successfully employed and operated in various computational environments, confirming their robustness. The experimental results show that the total runtime of both MPI + OpenMP and MPI + CUDA methods is significantly shorter than that of single-thread processing. MPI + CUDA generally shows faster performance when running on multiple nodes than MPI + OpenMP, especially on large numbers of nodes. The single-precision GPU-based processing yields faster computation than the double-precision processing; while the single- and doubleprecision CPU-based processing shows consistent computational performance. The gridding time remarkably increases when the support size of the convolution kernel is larger than 8 and the image size is larger than 2,048 pixels. The present research offers useful guidance for developing SKA imaging pipelines.

Explore related subjects

Keep this discovery

BibTeXRIS

Baoqiang Lao, Tao An, Ang Yu, Wenhui Zhang, Junyi Wang, Quan Guo, Shaoguang Guo, Xiaocong Wu. 2019-05-08. Parallel implementation of w-projection wide-field imaging. https://doi.org/10.1016/j.scib.2019.04.004

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related papers

The EDD Radio Astronomy Backend Framework

Modern digital radio astronomy receivers produce increasingly wide-bandwidth, high bit-rate data streams that necessitate the development of flexible, scalable, and maintainable backend processing and recording systems. Historically, such backend instrumentation has been tightly coupled to telescope observing modes, limiting reuse between observatories and science cases. We present the Effelsberg Direct Digitisation (EDD) backend framework, a software-defined architecture for constructing real-time radio astronomy backends on commodity off-the-shelf computing infrastructure. We describe its design, implementation, supported observing modes, and operational deployments. EDD separates a common core framework from plugin-provided observing capabilities. The core provides orchestration, telescope interfaces, pipeline lifecycle management, monitoring, and deployment tooling, while plugins implement processing pipelines for specific observing modes. The framework is designed to support both single-dish and interferometric instruments through site-specific configuration and plugin selection. EDD currently supports spectroscopy and spectropolarimetry, pulsar timing and searching, baseband recording, very long baseline interferometry, correlation, and beamforming. Operational deployments include the Effelsberg 100-m telescope, the SKA-MPI prototype dish, the Thai National Radio Telescope, and the ARGOS interferometric prototype array. By separating common services, observing-mode plugins, and site-specific configuration, it allows backend capabilities to be deployed across heterogeneous telescope environments and provides a community resource for broadband radio astronomy instrumentation.

astro-ph.IM

Bayesian Superiority in On/Off analysis

We present a detailed comparison of Bayesian criteria with three non-informative priors - flat, Jeffreys, and scale-invariant - for testing a signal against an unknown background and compare them with the classical frequentist Li-Ma approach in the On/Off problem. We perform Monte Carlo simulations for various background levels and evaluate the Li-Ma and Bayesian criteria by their Type I error rates. We then simulate a nonzero signal and compare the criteria in terms of Type II error rates. We find that the Bayesian criterion with the Jeffreys prior yields lower Type I and Type II error rates than the Li-Ma criterion. In addition, we show that the Bayesian criteria are more robust than the Li-Ma criterion when the background distribution is overdispersed relative to the Poisson distribution.

astro-ph.IM

An RFSoC-based Backend and Timing System for the Balloon-borne Very Long Baseline Interferometry Experiment

We present the design and performance characterization of the digital backend and precision-timing system for the Balloon-borne Very Long Baseline Interferometry Experiment (BVEX), a pathfinder for high-frequency stratospheric VLBI at 22 GHz. The backend uses one of the four 14-bit analog-to-digital converter inputs on an AMD-Xilinx RFSoC 4x2. Although the converters support sampling rates up to 5 GSPS, the flight configuration digitizes the 2-4 GHz intermediate frequency at 4.096 GSPS. CASPER firmware provides both a high-resolution spectrometer for pointing and receiver verification, and a VLBI acquisition chain with two-bit requantization that records at a rate of about 8.2 Gbps. The timestamped data packets are sent over 100 Gigabit Ethernet (GbE) to a 16 TB NVMe array in a storage computer that draws approximately 70-80 W. The timing chain uses a Rakon oven-controlled crystal oscillator as a timing reference while a time-interval counter measures its drift relative to a GPS reference with approximately 60 ps resolution. This is the first deployment of an RFSoC-based VLBI backend and precision-timing system on a stratospheric balloon. Ground tests validated the backend, spectrometer, and timing chain. The August 2025 CSA STRATOS flight ended before reaching the target float altitude because of a balloon failure, and as a result no science observations were obtained. For the planned 2027 reflight, we are developing a conduction-cooled data storage computer with 24 TB of NVMe capacity and a direct data path from the 100 GbE interface to the NVMe array.

astro-ph.IM