Search arXivSearch

arXiv · 2012.10411

CCAT-prime: Designs and status of the first light 280 GHz MKID array and Mod-Cam receiver

Abstract

The CCAT-prime project's first light array will be deployed in Mod-Cam, a single-module testbed and first light cryostat, on the Fred Young Submillimeter Telescope (FYST) in Chile's high Atacama desert in late 2022. FYST is a six-meter aperture telescope being built on Cerro Chajnantor at an elevation of 5600 meters to observe at millimeter and submillimeter wavelengths.1 Mod-Cam will pave the way for Prime-Cam, the primary first generation instrument, which will house up to seven instrument modules to simultaneously observe the sky and study a diverse set of science goals from monitoring protostars to probing distant galaxy clusters and characterizing the cosmic microwave background (CMB). At least one feedhorn-coupled array of microwave kinetic inductance detectors (MKIDs) centered on 280 GHz will be included in Mod-Cam at first light, with additional instrument modules to be deployed along with Prime-Cam in stages. The first 280 GHz detector array was fabricated by the Quantum Sensors Group at NIST in Boulder, CO and includes 3,456 polarization-sensitive MKIDs. Current mechanical designs allow for up to three hexagonal arrays to be placed in each single instrument module. We present details on this first light detector array, including mechanical designs and cold readout plans, as well as introducing Mod-Cam as both a testbed and predecessor to Prime-Cam.

Explore related subjects

Keep this discovery

BibTeXRIS

Cody J. Duell, Eve M. Vavagiakis, Jason Austermann, Scott C. Chapman, Steve K. Choi, Nicholas F. Cothard, Brad Dober, Patricio Gallardo, Jiansong Gao, Christopher Groppi, Terry L. Herter, Gordon J. Stacey, Zachary Huber, Johannes Hubmayr, Doug Johnstone, Yaqiong Li, Philip Mauskopf, Jeff McMahon, Michael D. Niemack, Thomas Nikola, Kayla Rossi, Sara Simon, Adrian K. Sinclair, Michael Vissers, Jordan Wheeler, Bugao Zou. 2020-12-18. CCAT-prime: Designs and status of the first light 280 GHz MKID array and Mod-Cam receiver. https://doi.org/10.1117/12.2562757

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related papers

The EDD Radio Astronomy Backend Framework

Modern digital radio astronomy receivers produce increasingly wide-bandwidth, high bit-rate data streams that necessitate the development of flexible, scalable, and maintainable backend processing and recording systems. Historically, such backend instrumentation has been tightly coupled to telescope observing modes, limiting reuse between observatories and science cases. We present the Effelsberg Direct Digitisation (EDD) backend framework, a software-defined architecture for constructing real-time radio astronomy backends on commodity off-the-shelf computing infrastructure. We describe its design, implementation, supported observing modes, and operational deployments. EDD separates a common core framework from plugin-provided observing capabilities. The core provides orchestration, telescope interfaces, pipeline lifecycle management, monitoring, and deployment tooling, while plugins implement processing pipelines for specific observing modes. The framework is designed to support both single-dish and interferometric instruments through site-specific configuration and plugin selection. EDD currently supports spectroscopy and spectropolarimetry, pulsar timing and searching, baseband recording, very long baseline interferometry, correlation, and beamforming. Operational deployments include the Effelsberg 100-m telescope, the SKA-MPI prototype dish, the Thai National Radio Telescope, and the ARGOS interferometric prototype array. By separating common services, observing-mode plugins, and site-specific configuration, it allows backend capabilities to be deployed across heterogeneous telescope environments and provides a community resource for broadband radio astronomy instrumentation.

astro-ph.IM

Bayesian Superiority in On/Off analysis

We present a detailed comparison of Bayesian criteria with three non-informative priors - flat, Jeffreys, and scale-invariant - for testing a signal against an unknown background and compare them with the classical frequentist Li-Ma approach in the On/Off problem. We perform Monte Carlo simulations for various background levels and evaluate the Li-Ma and Bayesian criteria by their Type I error rates. We then simulate a nonzero signal and compare the criteria in terms of Type II error rates. We find that the Bayesian criterion with the Jeffreys prior yields lower Type I and Type II error rates than the Li-Ma criterion. In addition, we show that the Bayesian criteria are more robust than the Li-Ma criterion when the background distribution is overdispersed relative to the Poisson distribution.

astro-ph.IM

An RFSoC-based Backend and Timing System for the Balloon-borne Very Long Baseline Interferometry Experiment

We present the design and performance characterization of the digital backend and precision-timing system for the Balloon-borne Very Long Baseline Interferometry Experiment (BVEX), a pathfinder for high-frequency stratospheric VLBI at 22 GHz. The backend uses one of the four 14-bit analog-to-digital converter inputs on an AMD-Xilinx RFSoC 4x2. Although the converters support sampling rates up to 5 GSPS, the flight configuration digitizes the 2-4 GHz intermediate frequency at 4.096 GSPS. CASPER firmware provides both a high-resolution spectrometer for pointing and receiver verification, and a VLBI acquisition chain with two-bit requantization that records at a rate of about 8.2 Gbps. The timestamped data packets are sent over 100 Gigabit Ethernet (GbE) to a 16 TB NVMe array in a storage computer that draws approximately 70-80 W. The timing chain uses a Rakon oven-controlled crystal oscillator as a timing reference while a time-interval counter measures its drift relative to a GPS reference with approximately 60 ps resolution. This is the first deployment of an RFSoC-based VLBI backend and precision-timing system on a stratospheric balloon. Ground tests validated the backend, spectrometer, and timing chain. The August 2025 CSA STRATOS flight ended before reaching the target float altitude because of a balloon failure, and as a result no science observations were obtained. For the planned 2027 reflight, we are developing a conduction-cooled data storage computer with 24 TB of NVMe capacity and a direct data path from the 100 GbE interface to the NVMe array.

astro-ph.IM