Search arXiv⌕ Search

arXiv · 2506.23509

Power-Gas Infrastructure Planning under Weather-induced Supply and Demand Uncertainties

Abstract

Implementing economy-wide decarbonization strategies based on decarbonizing the power grid via variable renewable energy (VRE) expansion and electrification of end-uses requires new approaches for energy infrastructure planning that consider, among other factors, weather-induced uncertainty in demand and VRE supply. An energy planning model that fails to account for these uncertainties can hinder the intended transition efforts to a low-carbon grid and increase the risk of supply shortage especially during extreme weather conditions. Here, we consider the generation and transmission expansion problem of joint power-gas infrastructure and operations planning under the uncertainty of both demand and renewable supply. We propose two distributionally robust optimization approaches based on moment (MDRO) and Wasserstein distance (WDRO) ambiguity sets to endogenize these uncertainties and account for the change in the underlying distribution of these parameters that is caused by the climate change, among other factors. Furthermore, our model considers the risk-aversion of the energy planners in the modeling framework via the conditional value-at-risk (CVaR) metric. An equivalent mixed-integer linear programming (MILP) reformulation of both modeling frameworks is presented, and a computationally efficient approximation scheme to obtain near-optimal solutions is proposed. We demonstrate the resulting DRO planning models and solution strategy via a New England case study under different levels of end-use electrification and decarbonization targets. Our experiments systematically explore different modeling aspects and compare the DRO models with stochastic programming (SP) results.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Rahman Khorramfar, Dharik Mallapragada, Saurabh Amin. 2025-09-10. Power-Gas Infrastructure Planning under Weather-induced Supply and Demand Uncertainties. https://arxiv.org/abs/2506.23509

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related papers

Simultaneous state estimation and control for nonlinear systems subject to bounded disturbances

In this work, we address the output--feedback control problem for nonlinear systems under bounded disturbances using a moving horizon approach. The controller is posed as an optimisation-based problem that simultaneously estimates the state trajectory and computes future control inputs. It minimises a criterion that involves finite backward and forward horizons with respect to the unknown initial state, measurement noises and control input variables.The main novelty of this work relies on linking the lengths of the forward and backward windows with the closed-loop stability, assuming detectability and decoding sufficient conditions to assure system stabilizability. It leads to a formulation that does not require to be a Control Lyapunov Function for the terminal cost of the controller. Simulation examples are carried out to compare the performance of solving simultaneously and independently the estimation and control problems. Furthermore, the examples show how the controller influences the length of the estimation window through its gain.

eess.SY↗

On finite-horizon approximation of an infinite-horizon feedback Nash equilibrium in discrete-time LQ games

Computing feedback Nash equilibria (FNEs) in infinite-horizon discrete-time linear-quadratic (LQ) dynamic games remains computationally challenging. Inspired by model predictive control (MPC) in single-agent optimal control, we address this challenge with a finite-horizon strategy for approximating one such FNE. The finite-horizon strategy is as follows. Each player $i$ has an individual prediction horizon $T^i$. At each stage, player $i$ envisions an auxiliary $T^i$-stage game, computes its unique FNE, and implements only the first-stage control. Our main results are as follows. First, we give parameter conditions that guarantee geometric convergence of the coupled Riccati iteration to a stabilizing solution. Second, under these conditions, the finite-horizon strategies stabilize the system, and each player's total cost converges to the limiting FNE cost as all prediction horizons tend to infinity. Third, we derive an explicit upper bound on this cost gap that decreases geometrically with the shortest prediction horizon. This bound tells us how long the prediction horizons need to be for a given accuracy. The strategy is tractable and implementable, as it avoids directly solving the coupled algebraic Riccati equations of the infinite-horizon game.

eess.SY↗

Closed Loop Reference Optimization for Extrusion Additive Manufacturing

Various defects occur during material extrusion additive manufacturing processes that degrade the quality of the 3D printed parts and lead to significant material waste. This motivates feedback control of the extrusion process to mitigate defects and prevent print failure. We propose a linear quadratic regulator (LQR) for closed-loop control with force feedback to provide accurate width tracking of the extruded filament. Furthermore, we propose preemptive optimization of the reference force given to the LQR that accounts for the performance of the LQR and generates the optimal reference for the closed loop extrusion dynamics and machine constraints. Simulation results demonstrate the improved tracking performance and response time. Experiments on a Fused Filament Fabrication 3D printer showcase a root mean square error improvement of 39.57% compared to tracking the unmodified reference as well as an 83.7% shorter settling time.

eess.SY↗