Search arXivSearch

arXiv · 2509.19242

Linear Regression under Missing or Corrupted Coordinates

Abstract

We study multivariate linear regression under Gaussian covariates in two settings, where data may be erased or corrupted by an adversary under a coordinate-wise budget. In the incomplete data setting, an adversary may inspect the dataset and delete entries in up to an $η$-fraction of samples per coordinate; a strong form of the Missing Not At Random model. In the corrupted data setting, the adversary instead replaces values arbitrarily, and the corruption locations are unknown to the learner. Despite substantial work on missing data, linear regression under such adversarial missingness remains poorly understood, even information-theoretically. Unlike the clean setting, where estimation error vanishes with more samples, here the optimal error remains a positive function of the problem parameters. Our main contribution is to characterize this error up to constant factors across essentially the entire parameter range. Specifically, we establish novel information-theoretic lower bounds on the achievable error that match the error of (computationally efficient) algorithms. A key implication is that, perhaps surprisingly, the optimal error in the missing data setting matches that in the corruption setting-so knowing the corruption locations offers no general advantage.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Ilias Diakonikolas, Jelena Diakonikolas, Daniel M. Kane, Jasper C. H. Lee, Thanasis Pittas. 2026-07-14. Linear Regression under Missing or Corrupted Coordinates. https://arxiv.org/abs/2509.19242

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related papers

An efficient implementation for solving the all pairs minimax path problem in an undirected dense graph

We provide an efficient $ O(n^2) $ implementation for solving the all pairs minimax path problem or widest path problem in an undirected dense graph. It is a code implementation of the Algorithm 4 (MMJ distance by Calculation and Copy) in a previous paper. The distance matrix is also called the all points path distance (APPD). We conducted experiments to test the implementation and algorithm, compared it with several other algorithms for solving the APPD matrix. Result shows Algorithm 4 works good for solving the widest path or minimax path APPD matrix. It can drastically improve the efficiency for computing the APPD matrix. There are several theoretical outcomes which claim the APPD matrix can be solved accurately in $ O(n^2) $ . However, they are impractical because there is no code implementation of these algorithms. It seems Algorithm 4 is the first algorithm that has an actual code implementation for solving the APPD matrix of minimax path or widest path problem in $ O(n^2) $, in an undirected dense graph.

cs.DS

Approximating Partition in Deterministic Near-Linear Time

We propose a deterministic $\widetilde{O}(n + \frac{1}ε)$-time FPTAS (Fully Polynomial-Time Approximation Scheme) for the classical Partition problem. This is the best possible (up to a polylogarithmic factor) assuming SETH (Strong Exponential Time Hypothesis) [Abboud, Bringmann, Hermelin, and Shabtay'22]. Prior to our work, the best known FPTAS for Partition runs in $\widetilde{O}(n + (\frac{1}ε)^{5/4})$ time [Deng, Jin and Mao'23, Wu and Chen'22]. Our result is obtained by solving a more general problem of weakly approximating Subset Sum.

cs.DS

Dynamic Treewidth in Logarithmic Time

We present a dynamic data structure that maintains a tree decomposition of width at most $9k+8$ of a dynamic graph with treewidth at most $k$, which is updated by edge insertions and deletions. The amortized update time of our data structure is $2^{O(k)} \log n$, where $n$ is the number of vertices. The data structure also supports maintaining any ``dynamic programming scheme'' on the tree decomposition, providing, for example, a dynamic version of Courcelle's theorem with $O_{k}(\log n)$ amortized update time; the $O_{k}(\cdot)$ notation hides factors that depend on $k$. This improves upon a result of Korhonen, Majewski, Nadara, Pilipczuk, and Sokołowski [FOCS 2023], who gave a similar data structure but with amortized update time $2^{k^{O(1)}} n^{o(1)}$. Furthermore, our data structure is arguably simpler. Our main novel idea is to maintain a tree decomposition that is ``downwards well-linked'', which allows us to implement local rotations and analysis similar to those for splay trees.

cs.DS