Relining or Replacement: How Timing, Costs, and Infrastructure Shape U.S. Primary Steel Decarbonization
Abstract
Imminent blast furnace relinings create a consequential investment window for U.S. primary steel decarbonization. Using plant-level capacity planning and stochastic operations modeling, we quantify the costs, infrastructure, and fiscal requirements to transition legacy blast furnace sites to direct reduction under supply-side incentives. Under baseline assumptions, post-subsidy premiums above average blast furnace costs, including relining, are 272 to 427 dollars per ton of steel for near-zero-emission hydrogen-based direct reduction and 115 to 181 dollars for natural-gas-based production. Representative facilities producing two million tons of steel annually at legacy locations require approximately 4 to 6.5 and 0.7 to 1.1 GW of renewable generation and battery storage, respectively. This translates to 65 and 12 GW across the unrelined fleet for hydrogen- and natural gas-based pathways, respectively. These findings connect replacement timing to costs, infrastructure, and public support, motivating a sequenced transition through clean-powered natural-gas-based direct reduction to avert blast furnace relining, reduce emissions by 57 percent relative to blast furnaces, and preserve options for deeper decarbonization through hydrogen substitution or carbon capture.
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
Mohamed Atouife, Yuezhang He, Jesse D. Jenkins. 2026-10-10. Relining or Replacement: How Timing, Costs, and Infrastructure Shape U.S. Primary Steel Decarbonization. https://arxiv.org/abs/2610.14865
Cite the original work for its findings. Save a collection to share your selection of sources.