Search arXiv⌕ Search

arXiv · 2610.30084

Why the Swing Parameters Are Sloppy

Abstract

Evangelou, Stanković, Kevrekidis and Transtrum compared analytic and data-driven assessments of parameter identifiability for the infinite-bus synchronous generator. Fisher information with the manifold boundary approximation method (MBAM), and output diffusion maps with geometric harmonics, report the same six identifiable parameters on the late window $t \in [3, 5]\text{ s}$, and both place the inertia $H$ and the damping $D$ among the unidentifiable ones. We explain this result from the geometry of the dynamics rather than from that of the parameter-to-data map. The rotor swing is a fast fibre that has collapsed onto a two-dimensional normally attracting invariant manifold (NAIM) of the transient fluxes before the window opens. The zeroth-order NAIM is exactly independent of $H$, $D$, $T_{d0}''$ and $T_{q0}''$, four of the five MBAM limits. We prove, under stated smoothness and rank conditions, that each of the four limits is a boundary of the model manifold at a distance equal, to first order in the parameter, to its current profiled speed. The same analysis predicts how identifiability changes with the experiment: neither a larger initial speed deviation nor a load change restores $H$ or $D$ in the late window, whereas the early window $[0, 2]\text{ s}$ makes $H$ the best-determined parameter. Evaluated in a physical metric fixed by synchrophasor accuracy limits, the late window identifies five parameters rather than six and the early window nine. The spiked-covariance structure of the linearised trajectory map explains why the principal components of whitened, sampled trajectories reproduce the prior-scaled Fisher spectrum, and regression on those components attains the Fisher-predicted recovery error in 113 of 114 parameter--scenario pairs.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

M Parimi, Shashank Varma, Sunny Kumar, S R Wagh, Navdeep Singh. 2026-10-21. Why the Swing Parameters Are Sloppy. https://arxiv.org/abs/2610.30084

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related papers

Opinion Dynamics in Social Multiplex Networks with Mono and Bi-directional Interactions in the Presence of Leaders

We delve into the dynamics of opinions within a multiplex network using coordination games, where agents communicate either through one-way or two-way interactions, and where a designated leader may be present. By employing graph theory and Markov chains, we illustrate that despite zero diagonal elements in transition probability matrices or decomposable layers, opinions converge under specific conditions on the layers, leading to a consensus, and we show by a counterexample that a spanning tree in the union of the layers does not suffice. We further scrutinize the convergence rates of opinion dynamics in networks with one-way versus two-way interactions. We find that in networks with a designated leader, opinions converge towards the initial opinion of the leader, whereas in networks without a designated leader, opinions converge to a convex combination of the opinions of agents. Moreover, we emphasize the crucial role of designated leaders in steering opinion convergence within the network. Paired experiments on 1,200 random multiplex networks show that a leader slows down convergence, and that two-way interactions slow it down in the presence of a leader but speed it up in its absence.

eess.SY↗

Network-Aware Progressive Replacement Sequence Planning for Laser-Enhanced BeiDou Navigation Constellations

The early satellites of the third-generation BeiDou Navigation Satellite System (BDS-3) are approaching the end of their design lifetime, making progressive constellation replacement an inevitable engineering task. Meanwhile, laser inter-satellite links (LISLs) offer high-precision time transfer, ranging, and high-rate data forwarding, providing a promising upgrade path for future BeiDou satellites. This paper investigates the replacement-sequence planning problem for progressively replacing legacy microwave satellites with laser-enabled satellites from a networking perspective. Since practical replacement decisions remain constrained by legacy satellite lifetime, on-orbit condition, laser satellite manufacturing readiness, and launch scheduling, networking information is used as an auxiliary criterion in the actual engineering replacement process. An integer linear programming model is developed to evaluate the network value of intermediate laser--microwave hybrid states. Based on this common state evaluator, two complementary planning methods are developed. A priority-aware exact method supports round-wise network-assisted launch decisions, while a visibility-guided adaptive large-neighborhood search is used for full-sequence planning and provides a full-horizon network-oriented near-optimal reference. Simulations using the actual BDS-3 constellation show that stronger network participation leads to earlier and larger ground-connected laser subnetworks, fewer microwave-dependent satellites, better coordination between laser-backbone growth and high-rate ground access, and improved residual microwave-layer performance. These results provide a quantitative basis for incorporating network performance as an auxiliary criterion in future BeiDou replacement planning.

eess.SY↗

Physically Constrained Agentic AI for Energy Scheduling

Agentic AI extends energy management beyond fixed-form interaction by translating natural-language requests into coordinated scheduling actions. We present a hierarchical ReAct Energy Management System (EMS) in which one orchestrator coordinates specialist agent types for shiftable appliances, EV charging, and thermal control. Physical authorization is separated from language generation: a deterministic critic reconstructs each integrated day-ahead candidate and checks its schema, appliance cycles, device power, thermal comfort, and, when active, the whole power feeder limit. Across Qwen 3.5 checkpoints, single-appliance mixed-integer schedules were feasible in 83.3 percent of runs. Localized feedback produced no accepted coupled schedule, whereas a multi-step policy authorized 6/6 current coupled runs: 3/3 for 27B and 3/3 for 35B-A3B. The standard occupied-window policy permits pre-conditioning, enforces comfort from 09:00-18:00. Every accepted schedule passed an independent final replay. Feasible costs were 2522.499 JPY for 27B and 1592.697 JPY for 35B-A3B, which are slightly higher than the mathematical optimization optimum of 1343.380 JPY. These results establish a fail-closed workflow for agentic MIP and MILP energy scheduling under the declared physical model.

eess.SY↗