Readiness-Constrained Pre-Islanding Dispatch for Military Microgrids
Abstract
Military installation energy readiness depends on having sufficient resources to sustain mission-critical loads throughout a prolonged utility outage. This paper develops a method to help operators manage energy resources during normal grid-connected operation while preserving islanded readiness. A robust viability kernel identifies combinations of battery energy, fuel, and load-shifting capability sufficient to sustain critical load under uncertain demand and photovoltaic generation. A probability bound translates stochastic generator start failures and recovery into a deterministic generator count selected to meet a specified availability requirement at islanding. Case studies for a fourteen-day islanding requirement at 0.999 islanding-entry availability show that advance warning of an outage can be used to prepare resources to meet a higher readiness requirement before islanding begins. The case studies further demonstrate that economic-only operation and the evaluated fixed battery reserve policy can fail to sustain critical load for the required duration, whereas enforcing the resource-dependent requirement preserves readiness at a modest increase in modeled grid-connected operating cost. These results demonstrate how active resource management can preserve long-duration energy readiness. The framework also helps commanders understand how readiness changes with operating conditions, even when the available resources remain the same.
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
Aidan Looney, Annie Weathers, Nicholas Judson. 2026-10-29. Readiness-Constrained Pre-Islanding Dispatch for Military Microgrids. https://arxiv.org/abs/2610.40078
Cite the original work for its findings. Save a collection to share your selection of sources.