arXiv · cs/0209033
Preemptive Scheduling of Equal-Length Jobs to Maximize Weighted Throughput
Abstract
We study the problem of computing a preemptive schedule of equal-length jobs with given release times, deadlines and weights. Our goal is to maximize the weighted throughput, which is the total weight of completed jobs. In Graham's notation this problem is described as (1 | r_j;p_j=p;pmtn | sum w_j U_j). We provide an O(n^4)-time algorithm for this problem, improving the previous bound of O(n^{10}) by Baptiste.
Explore related subjects
Keep this discovery
Philippe Baptiste, Marek Chrobak, Christoph Durr, Wojciech Jawor, Nodari Vakhania. 2003-03-11. Preemptive Scheduling of Equal-Length Jobs to Maximize Weighted Throughput. https://arxiv.org/abs/cs/0209033
Cite the original work for its findings. Save a collection to share your selection of sources.