arXiv · cs/0410046
A Note on Scheduling Equal-Length Jobs to Maximize Throughput
Abstract
We study the problem of scheduling equal-length jobs with release times and deadlines, where the objective is to maximize the number of completed jobs. Preemptions are not allowed. In Graham's notation, the problem is described as 1|r_j;p_j=p|\sum U_j. We give the following results: (1) We show that the often cited algorithm by Carlier from 1981 is not correct. (2) We give an algorithm for this problem with running time O(n^5).
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
Marek Chrobak, Christoph Durr, Wojciech Jawor, Lukasz Kowalik, Maciej Kurowski. 2021-05-12. A Note on Scheduling Equal-Length Jobs to Maximize Throughput. https://searcharxiv.org/abs/cs/0410046
Citations retain the original authors and DOI and include this site’s record URL. If this discovery service contributed to your research, you can also cite Search arXiv by Indiciae: BibTeX · RIS.