arXiv · cs/0507016
Minimizing makespan in flowshop with time lags
Abstract
We consider the problem of minimizing the makespan in a flowshop involving maximal and minimal time lags. Time lag constraints generalize the classical precedence constraints between operations. We assume that such constraints are only defined between operations of the same job. We propose a solution method and present several extensions.
Explore related subjects
Keep this discovery
Julien Fondrevelle, Ammar Oulamara, Marie-Claude Portmann. 2005-07-06. Minimizing makespan in flowshop with time lags. https://arxiv.org/abs/cs/0507016
Cite the original work for its findings. Save a collection to share your selection of sources.