Search arXivSearch

arXiv · 2207.01192

Achievement of 200,000 hours of operation at KEK 7-GeV electron 4-GeV positron injector linac

Abstract

KEK electron positron injector LINAC initiated the injection operation into Photon Factory (PF) light source in 1982. Since then for 39 years, it has served for multiple projects, namely, TRISTAN, PF-AR, KEKB, and SuperKEKB. Its total operation time has accumulated 200 thousand hours on May 7, 2020. We are extremely proud of the achievement following continuous efforts by our seniors. The construction of the injector LINAC started in 1978, and it was commissioned for PF with 2.5 GeV electron in 1982. In parallel, the positron generator linac was constructed for the TRISTAN collider project. The slow positron facility was also commissioned in 1992. After the KEKB asymmetric-energy collider project was commissioned in 1998 with direct energy injections, the techniques such as two-bunch acceleration and simultaneous injection were developed. As the soft structure design of the LINAC was too weak against the great east Japan earthquake, it took three years to recover. Then the construction and commissioning for the SuperKEKB project went on, and the simultaneous top-up injection into four storage rings contributes to the both elementary particle physics and photon science.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Kazuro Furukawa, Mitsuo Akemoto, Dai Arakawa, Yoshio Arakida, Yusei Bando, Hiroyasu Ego, Yoshinori Enomoto, Toshiyasu Higo, Hiroyuki Honma, Naoko Iida, Kazuhisa Kakihara, Takuya Kamitani, Hiroaki Katagiri, Masato Kawamura, Shuji Matsumoto, Toshihiro Matsumoto, Hideki Matsushita, Katsuhiko Mikawa, Takako Miura, Fusashi Miyahara, Hiromitsu Nakajima, Takuya Natsui, Yujiro Ogawa, Satoshi Ohsawa, Yuichi Okayasu, Takao Oogoe, Muhammad Abdul Rehman, Itsuka Satake, Masanori Satoh, Yuji Seimiya, Tetsuo Shidara, Akihiro Shirakawa, Hirohiko Someya, Tsuyoshi Suwada, Madoka Tanaka, Di Wang, Yoshiharu Yano, Kazue Yokoyama, Mitsuhiro Yoshida, Takashi Yoshimoto, Rui Zhang, Xiangyu Zhou. 2022-07-04. Achievement of 200,000 hours of operation at KEK 7-GeV electron 4-GeV positron injector linac. https://doi.org/10.1088/1742-6596%2F2420%2F1%2F012021

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related papers

Approximate solution of an adapted Bethe transport equation for electron scattering in foils

A new semi-analytical model for electron scattering in foils is presented valid for thin foils and electron-beam kinetic energies up to roughly $100$ keV and from 20 keV at a dimensionless foil thickness of $20$, and higher energies for thinner foils. To perform calculations, an approximate solution is constructed by Hankel transforms of an adapted Bethe transport equation for electron scattering. The Wentzel differential cross section is used in the Bethe transport Eq. and resulting integrals are solved analytically or approximated. These approximate solutions of the transport Eq.'s were compared to the Goudsmit-Saunderson solutions in gold, for thin samples with dimensionless thicknesses $λ=5,10,20$. We also compare to the Kawrakow \cite{Kawr} model, which uses the small angle approximation. We show that in the regime of $20$ to $100$ keV beam energies, our model performs better than Kawrakow's model and this is opposite above about 100 keV. Exactly, some angularly distributed beams and the influence of energy loss of the beam can be simulated with our model.

physics.acc-ph

Reconstruction of Beam Transverse Parameters in the Fermilab Side-Coupled Linac Using a Normalized Coordinate Framework

Quadrupole scans are a commonly used tool for beam second moment reconstruction. Limitations in the strength of the magnets and layout of the beamline elements frequently preclude simple quadrupole-drift-detector scans from collecting sufficient data for reconstruction. Using a normalized coordinate framework, we characterize the prerequisites for a robust simple quadrupole scan and expand these prerequisites to reconstruction from more complex optics. The beam second moments are investigated at two locations in the Fermilab Side-Coupled Linac under simple and complex optics, using this framework to maximize information gained from wire scanner profile measurements.

physics.acc-ph

Impedance of multilayer cylindrical structures with a material-filled beam region

Beam-coupling impedances in material media are relevant for ionization-cooling channels of a future muon collider, where the beam propagates in matter rather than vacuum. We extend the cylindrical field-matching formalism for multilayer structures to the case of a material-filled beam region surrounded by external layers with arbitrary electromagnetic properties. Relative to the vacuum formulation, the usual factor $1/γ^2$ is replaced by the material-dependent factor $F=1/\varepsilon_1-μ_1β^2$, and the radial propagation constant is modified accordingly. Analytical expressions are obtained for the monopolar longitudinal and dipolar transverse impedances, with the surrounding structure encoded through reflection coefficients determined by field matching. The formalism reduces to the known vacuum and perfectly conducting limits in the appropriate cases. Representative calculations are presented for absorber-relevant configurations, illustrating the dependence on the material properties of both the beam region and the surrounding layers. In particular, a finite beam-region conductivity can generate a real impedance component and reverse the sign of the imaginary space-charge impedance, while sufficiently high permittivity can give rise to resonant structures associated with oscillatory radial fields. The effect of finite-conductivity surroundings is also examined, showing the approach towards the perfectly conducting limit as the external conductivity is increased. The applicability of the infinite-length approximation is also discussed by comparison with finite-length mode-matching results.

physics.acc-ph